Construction pictures from the Bigelow Street site
The delivery of top-soil to allow for landscaping of the site is a welcome sign as spring gives way to early summer. Inside the computer room has filled with hot-aisles and cold-aisles, drops and cable tray. Even HG&E’s Skinner generator shed is getting a small facelift. The power is connected up too. We’re not drawing 10MW yet, but we’re on our way!
Click on each image to see an enlarged view
June 2012
The power monitor at one of the main breakers showing that the power is on. Right now the meter is collecting data to allow for power quality assessment – June 7
HG&E’s Skinner station undergoing a little renovation – June 7
In the computer room, a cold aisle with bus bars up high, and cable tray aligned with in-row coolers – June 7
In the computer room, hot aisle cable trays with drops to in-row coolers installed – June 7
Feeders coming out of substations, neatly tied up – June 7
Raised flooring on the second floor administrative being installed; covering will be carpeting – June 7
Raised floor in 1st floor public area, with terrazzo tile being installed – June 7
Exterior view from the bridge – June
Panorama of the computer room with in-row coolers continuing to be unloaded and installed – June 20
The generators being started up and load banked – June 20
Retaining wall work along the upper canal – June 20