Construction pictures from the Bigelow Street site
Click on each image to see an enlarged view
Shot of the first floor rooms beginning to get closed up in sheetrock (Feb 22).
Mechanicals installation on the first floor interior out to cooling towers (Feb 22).
Cooling towers getting built up as seen from the yard (Feb 22).
Shot of the data hall: grillage is in place, painters are prepping (Feb 22).
A view of the precast panels being installed on the exterior (Feb 16).
First floor main electric room, showing trays for wiring (Feb 16).
Pod mockup in the old Diamond Water building, in preparation for installation in the new facility (Feb 16).
February 2012
Images courtesy Leggat McCall Properties