Menu

See MGHPCC Grow June 2012

June 11, 2012

Construction pictures from the Bigelow Street site
The delivery of top-soil to allow for landscaping of the site is a welcome sign as spring gives way to early summer.  Inside the computer room has filled with hot-aisles and cold-aisles, drops and cable tray. Even HG&E's Skinner generator shed  is getting a small facelift. The power is connected up too. We're not drawing 10MW yet, but we're on our way!


Click on each image to see an enlarged view
June 2012


Images courtesy Leggat McCall Properties

Tags:

Research projects

The US ATLAS Northeast Tier 2 Center
Yale Budget Lab
Volcanic Eruptions Impact on Stratospheric Chemistry & Ozone
Towards a Whole Brain Cellular Atlas
Tornado Path Detection
The Kempner Institute - Unlocking Intelligence
The Institute for Experiential AI
Taming the Energy Appetite of AI Models
All Research Projects

Collaborative projects

ALL Collaborative PROJECTS

OUTREACH & EDUCATION PROJECTS

See ALL Scholarships
100 Bigelow Street, Holyoke, MA 01040